Bathroom Remodeling Services In Louisville And Oldham County

48

Years In Business

Family Owned

And Operated

Licensed

In Kentucky

3000+

Homeowners Served

The Room You Use Every Single Day.

A bathroom is a small room with a lot going on inside the walls. Get the waterproofing wrong and you find out about it in five years. We build tiled walk-in showers over the Schluter-KERDI system, set floors over Schluter Ditra, and hold the tile work to the last cut. Then we finish the room properly with a vanity, lighting, glass, and fixtures that suit the house.

Why Homeowners Choose Us For Bathroom Renovations

We Waterproof It Right

Every shower we build uses the Schluter-KERDI system behind the tile, and floors go over Schluter Ditra. It costs more than the shortcut and it is the reason our showers hold up.

Our Shop Builds Your Vanity

Kevin Danielson started this company in 1978 doing custom woodworking. When a vanity has to fit an odd wall in an old farmhouse, our woodworkers build it to fit.

The Tile Work Is The Whole Job

Niches, curbless pans, running bond, stacked, and custom patterns. Our installers are particular to the point of being difficult about it, and that is why people refer their neighbors.

You See The Room Before We Tear Anything Out

Your designer builds renderings so you can look at the layout, the tile, and the fixtures while they are still easy to change.

We Handle The Warranty Fights

One year workmanship warranty, plus we deal with manufacturers on your behalf. When a client’s fixture failed and the manufacturer had discontinued the line, we went back to them and had the part refabricated. You should not have to sit on hold with a faucet company.

What A Bathroom Remodel Includes

What A Bathroom Remodel Costs

Tier 1: Classic

Starting around $25,000 A tiled walk-in shower and a full refresh of the room.

Tier 2: Signature

Starting around $44,000 Frameless glass, patterned tile, upgraded stone.

Tier 3: Custom

Custom tile work, premium fixtures, and a custom vanity.

Frequently Asked Questions

How long does a bathroom remodel take?

Depending on the complexity & how custom a job is, a tier one bathroom remodel usually takes about 3-4 weeks with a tier 3 remodel taking 4-8 weeks from start to finish.

Yes, we handle all permitting and inspections throughout your project to ensure building codes are being met.

We can absolutely modify the bathroom layout to make the best use of the space. There are some limitations depending on existing plumbing, structural elements, and the overall scope of the project, but we’ll work with you to find the best layout possible within those parameters.

One year on all workmanship. You walk the job with your project manager at completion and receive your warranty documents. If something comes up, call the office and we will schedule a service visit, usually within one to five business days. We also handle manufacturer warranty claims on your behalf.

Can I replace my tub with a walk-in shower?

Yes, and it is one of the most common things we do. We take out the tub, build a tiled walk-in shower in its place over Schluter-KERDI waterproofing, and finish the rest of the room around it.

Tile and grout are not waterproof on their own. The membrane behind them is what keeps water out of your framing. We use Schluter-KERDI in showers and Schluter Ditra under tile floors on every bathroom we build.

Can you move the layout, or does everything stay put? We can move it. Relocating plumbing costs more and takes longer, and your designer will show you what the change buys you before you commit.

Yes. Vanities, linen closets, and built-ins are made in our own shop, which is how this company started in 1978.

No. We come out, look at the bathroom, and give you a free estimate.

Our Process

We come to you

No phone screening and no video call. We walk the kitchen with you, talk through what you want, and give you a free estimate based on what is actually in front of us.

Your designer builds the plan and the renderings, and we walk selections with you: tile, vanity, stone, glass, fixtures, and hardware. Your allowance package spells out what is included.

Our own crew does the work on a schedule you can follow. At the end you walk the job with your project manager, get your warranty documents, and get a care folder that covers how to look after your new shower.

Our Process